RS35243 E.V.M. — Scale — Tracks for IS-2 (Early Type)

SKU: RS35243

Scale:


Made specifically to enhance the scale model:

Prix de vente$43.95 USD Prix normal$48.83 USD
Economisez $4.88

Taxes exclues Frais d'envoi calculés au paiement

En stock

Welcome first time shoppers!

Get 10% off your order with the code NEW10

Overview

High resolution 3D printed track set representing early-type tracks for the IS-2 heavy tank. Designed to enhance realism with accurate link detail and consistent geometry suitable for advanced scale modeling.

What This Set Is For

  • Upgrading kit-supplied tracks with higher detail
  • Replacing simplified or inaccurate plastic tracks
  • Building an early-production IS-2 tank model

Best Use & Build Tips

Remove supports carefully with a sharp blade. Prime surface with high-quality primer to ensure paint adhesion. No sanding required due to high-resolution printing.

Specifications

Brand E.V.M.
SKU RS35243
Scale —
Product type Tracks (3D printed)
Category —

Why Modelers Choose It

  • High resolution 3D printing with sharp detail
  • Consistent track geometry for realistic sag and fit
  • Ideal for premium IS-2 builds