BR36006 E.V.M. 1/35 76mm Assorted Shells Set for ZiS-3, SU-76, KV-1 and T-34 (F-34)

SKU: BR36006

Scale: 1/35


Made specifically to enhance the scale model:

Prix de vente$21.47 USD Prix normal$23.85 USD
Economisez $2.38

Taxes exclues Frais d'envoi calculés au paiement

En stock

Welcome first time shoppers!

Get 10% off your order with the code NEW10

Overview

This 1/35 scale 76mm assorted ammunition set by E.V.M. includes finely detailed components for enhancing artillery and armored vehicle displays. The set features 6 turned brass cartridge cases, a photo-etched fret with cartridge bases, a decal with removable carrier film, and high-resolution resin-printed projectiles with crisp detailing.

What This Set Is For

  • 76mm ZiS-3 field gun
  • SU-76 self-propelled gun
  • KV-1 tank
  • T-34 tank equipped with F-34 gun

Best Use & Build Tips

  • Remove resin parts carefully with a sharp blade.
  • Prime resin surfaces with a high-quality primer to ensure paint adhesion.
  • Use CA glue (Superglue) for bonding metal and resin parts.
  • Apply decals over a glossy surface; carrier film can be removed after application if desired.

Specifications

Brand E.V.M.
SKU BR36006
Scale 1/35
Product type Ammunition detail set
Category Armor accessories

Why Modelers Choose It

  • Turned brass cartridge cases for realistic metallic finish
  • High-resolution resin projectiles with sharp detail
  • Photo-etched elements for enhanced accuracy
  • Decal with removable carrier film for a refined result