BR36005 E.V.M. 1/35 76mm UBP-353M HEAT Shells for ZiS-3, SU-76, KV-1, T-34 (F-34)

SKU: BR36005

Scale: 1/35


Made specifically to enhance the scale model:

Precio de oferta$21.47 USD Precio normal$23.85 USD
Ahorra $2.38

Impuestos excluidos. Los gastos de envío se calculan al finalizar la compra

Disponible

Welcome first time shoppers!

Get 10% off your order with the code NEW10

Overview

This 1/35 scale detail set from E.V.M. represents 76mm UBP-353M HEAT (High-Explosive Anti-Tank) ammunition. The kit includes high-resolution photopolymer resin projectiles, 6 turned metal shell cases, a photo-etched fret with case bases, and a decal sheet with removable varnish carrier film. Designed for maximum realism, the combination of metal, photo-etch, and resin ensures sharp detail and authentic appearance.

What This Set Is For

  • Enhancing WWII Soviet 76mm field and tank gun ammunition displays
  • Open ammo racks and fighting compartments
  • Artillery crew dioramas
  • Detailed vehicle stowage scenes

Compatibility

  • ZiS-3 76mm field gun
  • SU-76 self-propelled gun
  • KV-1 (76mm gun variants)
  • T-34 equipped with F-34 gun

Best Use & Build Tips

Remove resin parts carefully with a sharp blade. Prime surface with high-quality primer to ensure paint adhesion. No sanding required due to high-resolution printing. Use CA glue (Superglue) for bonding metal and photo-etched parts. Apply decals after painting; removable carrier film allows for a more realistic finish.

Specifications

Brand E.V.M.
SKU BR36005
Scale 1/35
Product type HEAT Shell Detail Set
Category Armor Ammunition

Why Modelers Choose It

  • High-resolution resin projectiles with sharp detail
  • Turned metal cases for realistic weight and finish
  • Photo-etched details for enhanced accuracy
  • Decals with removable carrier film for clean markings