BR36002 E.V.M. 1/35 76mm UBR-354A Armor-Piercing Shells for ZIS-3 / F-34

SKU: BR36002

Scale: 1/35


Made specifically to enhance the scale model:

Precio de oferta$21.47 USD Precio normal$23.85 USD
Ahorra $2.38

Impuestos excluidos. Los gastos de envío se calculan al finalizar la compra

Disponible

Welcome first time shoppers!

Get 10% off your order with the code NEW10

Overview

This 1/35 scale accessory set from E.V.M. represents 76mm UBR-354A armor-piercing ammunition. The set includes high-resolution 3D printed photopolymer resin projectiles, 6 turned brass cartridge cases, a photo-etched fret with case bottoms, and a decal sheet with removable lacquer backing. Designed for maximum realism and fine detail, this set enhances artillery and armored vehicle displays with authentic ammunition components.

What This Set Is For

  • ZIS-3 76mm divisional gun
  • SU-76 self-propelled gun
  • KV-1 tanks equipped with F-34 gun
  • T-34 tanks equipped with F-34 gun

Best Use & Build Tips

Remove supports carefully with a sharp blade. Prime surface with high-quality primer to ensure paint adhesion. No sanding required due to high-resolution printing. Use CA glue (Superglue) for bonding brass and photo-etched parts. Apply decals after painting; lacquer backing can be removed for a more realistic finish.

Specifications

Brand E.V.M.
SKU BR36002
Scale 1/35
Product type 3D Resin parts
Category Military Vehicle Ammunition Accessories

Why Modelers Choose It

  • High resolution 3D printed projectiles with crisp detail
  • Turned brass cases for authentic metallic appearance
  • Photo-etched components for added realism
  • Decals with removable lacquer film for scale accuracy