RS48104 E.V.M. 1/48 Ejection Seats K-36D-3.5 with 3D Decal Harness for Su-30SM (G.W.H.)

SKU: RS48104

Scale: 1/48


Made specifically to enhance the scale model:

Prix de vente$40.63 USD Prix normal$46.72 USD
Economisez $6.09

Taxes exclues Frais d'envoi calculés au paiement

En stock

Welcome first time shoppers!

Get 10% off your order with the code NEW10

Overview

High-resolution E.V.M. ejection seat set representing the K-36D-3.5 used on the Su-30SM. The set includes a 3D decal harness system designed to add realistic seat belts and suspension details with minimal assembly.

What This Set Is For

  • Detailing cockpit ejection seats on 1/48 scale Su-30SM models
  • Replacing or upgrading kit-supplied seats
  • Adding realistic harness detail using 3D decals

Compatibility

  • Great Wall Hobby (G.W.H.) Su-30SM kits

Best Use & Build Tips

For 3D decal parts, carefully cut elements from the sheet with a sharp blade. Apply using water as with standard decals, then position precisely. Use a soft brush to conform the decal to the surface. Allow to dry fully before sealing with a clear coat if desired.

Specifications

Brand E.V.M.
SKU RS48104
Scale 1:48
Product type Ejection seats with 3D decal harness
Category Aircraft accessories

Why Modelers Choose It

  • High-resolution detailing from E.V.M.
  • Realistic harness representation using 3D decals
  • Designed specifically for accurate cockpit upgrades