RS144004 E.V.M. 1/144 Landing Gear Wheels for Tu-95MS

SKU: RS144004

Scale: 1/144


Made specifically to enhance the scale model:

Prix de vente$27.74 USD Prix normal$31.90 USD
Economisez $4.16

Taxes exclues Frais d'envoi calculés au paiement

En stock

Welcome first time shoppers!

Get 10% off your order with the code NEW10

Overview

This high-resolution 3D printed set by E.V.M. provides accurately detailed landing gear wheels for the Tu-95MS in 1/144 scale. Designed to enhance realism, the set features crisp surface detail and correct proportions to upgrade or replace standard kit parts.

What This Set Is For

  • Upgrading landing gear wheels on a 1/144 Tu-95MS model
  • Replacing simplified or inaccurate kit wheels
  • Enhancing realism with sharper tread and hub detail
  • Improving overall presentation of finished aircraft builds

Compatibility

  • Designed for Tu-95MS aircraft kits in 1/144 scale
  • Check kit dimensions before installation for best fit

Best Use & Build Tips

Remove supports carefully with a sharp blade. Prime surface with high-quality primer to ensure paint adhesion. No sanding required due to high-resolution printing.

Specifications

Brand E.V.M.
SKU RS144004
Scale 1/144
Product type 3D Printed Detail Set
Category Aircraft Wheels

Why Modelers Choose It

  • High-resolution 3D printing
  • Crisp tread and hub detail
  • Accurate scale proportions
  • Clean finish with minimal preparation required