Filtros

Ordenar por:

238 productos

Ahorra $2.47
RS35240 E.V.M. — Model accessory for L - 2AG infrared illuminator - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35240 E.V.M. — Model accessory for L-2AG infrared illuminator Precio de oferta$22.22 USD Precio normal$24.69 USD

Enhance your T-64, T-72, or T-80 tank model with a precisely detailed L-2AG infrared illuminator, featuring clear parts and 3D-Printed details.

Ahorra $1.98
RS35238 E.V.M. — — for GST - 64 Early and Late Type - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35238 E.V.M. — — for GST-64 Early and Late Type Precio de oferta$17.78 USD Precio normal$19.76 USD

Add highly detailed position lights to accurately refine your modern Soviet and Russian AFV models.

Ahorra $2.47
RS35213 E.V.M. — Model Accessory for L - 2G "Luna" Infrared Illuminator - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35213 E.V.M. — Model Accessory for L-2G "Luna" Infrared Illuminator Precio de oferta$22.22 USD Precio normal$24.69 USD

This L-2G Luna infrared illuminator accessory provides exceptional detail for your 1:35 Soviet tank, including clear lamps and enough parts for two models.

Ahorra $1.73
RS35178 E.V.M. — 3D Printed Hex Nuts with Washer (1.7 mm) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35178 E.V.M. — 3D Printed Hex Nuts with Washer (1.7 mm) Precio de oferta$15.58 USD Precio normal$17.31 USD

Replace coarse kit fasteners on your 1:35 Tanks & AFVs with these finely rendered resin hex nuts and washers for superior mechanical realism.

Ahorra $1.73
RS35177 E.V.M. — 3D Printed Hex Nut with Washer S - 46 (D=1.45 mm) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35177 E.V.M. — 3D Printed Hex Nut with Washer S-46 (D=1.45 mm) Precio de oferta$15.58 USD Precio normal$17.31 USD

Provides 210 finely cast resin fasteners for enhancing realistic detail on 1:35 scale armor and vehicles.

Ahorra $1.73
RS35176 E.V.M. — 3D Printed Hex Nut with Washer S - 41 (1.3 mm) for Scale Models - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35176 E.V.M. — 3D Printed Hex Nut with Washer S-41 (1.3 mm) for Scale Models Precio de oferta$15.58 USD Precio normal$17.31 USD

Provide your armor models with 210 highly detailed resin fasteners, perfect for enhancing realism.

Ahorra $1.73
RS35175 E.V.M. — Hex Nut with Washer S - 36 (D=1.13 mm), 210 pcs — 3D Printed - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35175 E.V.M. — Hex Nut with Washer S-36 (D=1.13 mm), 210 pcs — 3D Printed Precio de oferta$15.58 USD Precio normal$17.31 USD

Enhance 1:35 scale AFV models with 3D-printed hex nuts and washers, offering superior realism for replacing kit parts or scratch-building.

Ahorra $1.73
RS35174 E.V.M. — Hex Nut with Washer S - 30 (0.94 mm) 3D Printed Set - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35174 E.V.M. — Hex Nut with Washer S-30 (0.94 mm) 3D Printed Set Precio de oferta$15.58 USD Precio normal$17.31 USD

Replace simplified molded-on fasteners with over 200 finely detailed hex nuts and washers for superior realism on tanks and AFVs.

Ahorra $1.73
RS35173 E.V.M. — 3D Printed Hex Nut with Washer S - 27 (0.85 mm) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35173 E.V.M. — 3D Printed Hex Nut with Washer S-27 (0.85 mm) Precio de oferta$15.58 USD Precio normal$17.31 USD

Enhance your 1:35 scale tanks and AFVs with 210 finely rendered hex nuts and washers, perfect for adding realistic mechanical fasteners to your builds.

Ahorra $1.73
RS35172 E.V.M. — 3D Printed S - 24 Hex Nuts with Washers (0.75 mm) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35172 E.V.M. — 3D Printed S-24 Hex Nuts with Washers (0.75 mm) Precio de oferta$15.58 USD Precio normal$17.31 USD

Elevate your 1:35 tanks and AFVs with 210 high-resolution resin hex nuts and washers for superior detail and realism.

Ahorra $1.73
RS35171 E.V.M. — Scale Hex Nut with Washer S - 21 (0.65 mm) 3D Printed Set for Scale Models - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35171 E.V.M. — Scale Hex Nut with Washer S-21 (0.65 mm) 3D Printed Set for Scale Models Precio de oferta$15.58 USD Precio normal$17.31 USD

Enhance the realism of your 1:35 scale AFV builds by upgrading simplified fasteners with these detailed resin nuts.

Ahorra $1.73
RS35170 E.V.M. — Hex Nut with Washer S - 18 (D=0.58 mm), 210 pcs - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35170 E.V.M. — Hex Nut with Washer S-18 (D=0.58 mm), 210 pcs Precio de oferta$15.58 USD Precio normal$17.31 USD

Enhance your 1:35 tank and AFV models with these high-resolution 3D-printed fasteners for exceptional realistic detailing.

Ahorra $1.98
RS35158 E.V.M. — Smoke Grenade Launchers AEK - 902 "Tucha" (Late Version) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35158 E.V.M. — Smoke Grenade Launchers AEK-902 "Tucha" (Late Version) Precio de oferta$17.78 USD Precio normal$19.76 USD

Upgrade your AFV build with accurate late-version AEK-902 Tucha launchers, featuring 3D-printed parts for loaded or unloaded display.

Ahorra $1.98
RS35157 E.V.M. 1:35 Smoke Dischargers AEK - 902 Tucha (Early) for Scale Models - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35157 E.V.M. 1:35 Smoke Dischargers AEK-902 Tucha (Early) for Scale Models Precio de oferta$17.78 USD Precio normal$19.76 USD

Upgrade your 1:35 scale tanks with accurate early Tucha smoke dischargers, assemblable loaded or unloaded.

Ahorra $1.73
RS35108 E.V.M. — 3D Printed Hex Nut S - 55 (D=1.7 mm) Set - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35108 E.V.M. — 3D Printed Hex Nut S-55 (D=1.7 mm) Set Precio de oferta$15.58 USD Precio normal$17.31 USD

Add crisp, miniature hex nut detail to elevate the realism of your tanks and AFVs.

Ahorra $1.73
RS35107 E.V.M. — Hex Nut S - 46 (1.45 mm) Set for Scale Models - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35107 E.V.M. — Hex Nut S-46 (1.45 mm) Set for Scale Models Precio de oferta$15.58 USD Precio normal$17.31 USD

Precision 3D-printed hex nuts in various diameters offer superior detail and accurate fit for enhancing tank and AFV model realism.

Ahorra $1.73
RS35106 E.V.M. — 3D Printed Hex Nut S - 41 Set for Scale Models - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35106 E.V.M. — 3D Printed Hex Nut S-41 Set for Scale Models Precio de oferta$15.58 USD Precio normal$17.31 USD

Nine sets of 210 varied resin hex nuts add incredibly fine, accurate mechanical detail to 1:35 Tanks & AFVs models.

Ahorra $1.73
RS35105 E.V.M. — 3D Printed Hex Nuts S - 36 (1.13 mm) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35105 E.V.M. — 3D Printed Hex Nuts S-36 (1.13 mm) Precio de oferta$15.58 USD Precio normal$17.31 USD

Precisely detailed hex nuts for adding ultra-fine fastener realism to your 1:35 scale AFV models.

Ahorra $1.73
RS35104 E.V.M. — Hex Nut S - 30 (D=0.94 mm), 210 pcs, 3D Printed - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35104 E.V.M. — Hex Nut S-30 (D=0.94 mm), 210 pcs, 3D Printed Precio de oferta$15.58 USD Precio normal$17.31 USD

Replace oversized or soft molded details on your 1:35 armor models with these crisp 3D-printed hex nuts.

Ahorra $1.73
RS35103 E.V.M. — Hex Nut S - 27 (0.85 mm) 210 pcs, 3D Printed - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35103 E.V.M. — Hex Nut S-27 (0.85 mm) 210 pcs, 3D Printed Precio de oferta$15.58 USD Precio normal$17.31 USD

Highly detailed hex nuts for adding realistic fasteners to your 1:35 scale tank models.

Universal Accessories

Universal PE accessories are photo-etched detail parts designed to work across multiple kits rather than being specific to a single model. These versatile sets include items that appear on many different vehicle types, aircraft, and ships: seatbelt and harness sets usable in any cockpit, generic mesh patterns for scratch-built screens and grilles, hinge sets for scratchbuilt hatches, rivet strip material, universal bolt head patterns, and standard military hardware like NATO tow hooks and lifting rings.

Popular universal PE sets include multi-scale seatbelt harness frets with enough parts for several builds, generic diamond-pattern mesh sheets for engine intake screens and storage basket weaving, universal fender material in various widths for scratch-building or replacing damaged kit fenders, and assorted bolt head strips in hex and round patterns. These sets are staples of the experienced modeler's supply shelf, ready to enhance any project regardless of manufacturer or subject.

Universal accessories are particularly valuable for diorama builders and scratch-builders who need detail parts not available in kit-specific PE sets. A sheet of fine mesh becomes an industrial fence or a vehicle cargo net. Bolt head strips add surface texture to scratchbuilt structures. Hinge sets and latch details bring scratchbuilt doors and panels to life. The versatility of these generic PE parts makes them some of the most frequently reordered items in our catalog.

Explore specific upgrade categories: Photo-Etched Detail Sets for kit-specific PE, Figures and Diorama for scene-building accessories, Modeling Tools for PE handling equipment, or browse the complete Aftermarket catalog.