Filtros

Ordenar por:

170 productos

Ahorra $2.43
RS48058 E.V.M. 1:48 UV - 26M Countermeasures Dispenser for Mil Mi - 8 (Trumpeter) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48058 E.V.M. 1:48 UV-26M Countermeasures Dispenser for Mil Mi-8 (Trumpeter) Precio de oferta$16.24 USD Precio normal$18.67 USD

This set represents the UV-26M passive countermeasures dispenser designed for the Mil Mi-8 helicopter. It...

Ahorra $3.00
RS48055 E.V.M. 1/48 LPG - 150M Winch (Deployed) for Mil Mi - 8 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48055 E.V.M. 1/48 LPG-150M Winch (Deployed) for Mil Mi-8 Precio de oferta$19.99 USD Precio normal$22.99 USD

This E.V.M. set replicates the LPG-150M external winch in a deployed configuration for the Mil...

Ahorra $4.74
RS40001 E.V.M. 1/35 Landing Gear Wheels for Ka - 29 (Hobby Boss) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS40001 E.V.M. 1/35 Landing Gear Wheels for Ka-29 (Hobby Boss) Precio de oferta$31.62 USD Precio normal$36.36 USD

This aftermarket set provides accurately shaped landing gear wheels for the Ka-29 helicopter model. Produced...

Ahorra $5.96
RS35193 E.V.M. 1/35 3D Printed Tank Gun 2A46M5 with Shroud for T - 72 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35193 E.V.M. 1/35 3D Printed Tank Gun 2A46M5 with Shroud for T-72 Precio de oferta$39.73 USD Precio normal$45.69 USD

This E.V.M. aftermarket set features a high-resolution, one-piece 3D printed tank gun representing the 2A46M5...

Ahorra $5.42
RS35137 E.V.M. 1/35 Howitzer barrel for 2S1 Gvozdika - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35137 E.V.M. 1/35 Howitzer barrel for 2S1 Gvozdika Precio de oferta$36.15 USD Precio normal$41.57 USD

Aftermarket replacement howitzer barrel for the 2S1 Gvozdika self-propelled artillery system in 1/35 scale. Designed...

Ahorra $2.62
RS35115 E.V.M. 1/35 B - 4 Panoramic Gun Sight Model 1930 for 203 mm Howitzer - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35115 E.V.M. 1/35 B-4 Panoramic Gun Sight Model 1930 for 203 mm Howitzer Precio de oferta$17.47 USD Precio normal$20.09 USD

High resolution 3D printed panoramic gun sight set representing the Model 1930 pattern for the...

Ahorra $9.25
RS35111 E.V.M. 1:35 Working Suspension Set for BTR - 70 (Trumpeter) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS35111 E.V.M. 1:35 Working Suspension Set for BTR-70 (Trumpeter) Precio de oferta$61.68 USD Precio normal$70.93 USD

High-resolution aftermarket working suspension set designed to add dynamic movement and improved realism to 1:35...

Ahorra $2.09
Template for painting T - 80 wheels (Trumpeter) 2 pcs - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVWT35007 KAV Models 1:35 Painting Mask Set for T-80 Wheels (Trumpeter) Precio de oferta$13.95 USD Precio normal$16.04 USD

1/35 Paint Mask by KAV Models. SKU: KAVWT35007. This painting mask set helps you achieve...

Ahorra $2.09
Template for painting T - 72/90 wheels (Trumpeter) 2 pcs - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVWT35005 KAV Models 1:35 Painting Mask Template T-72/90 Wheels (Trumpeter) Precio de oferta$13.95 USD Precio normal$16.04 USD

1/35 Paint Mask by KAV Models. SKU: KAVWT35005. Achieve clean, consistent wheel painting on your...

Ahorra $2.23
Glazing for ChTZ S - 65 "Stalinets" (Trumpeter) - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVCP72008 KAV Models 1/72 Glazing Set ChTZ S-65 Stalinets (Trumpeter) Precio de oferta$14.86 USD Precio normal$17.09 USD

1/72 Photo-Etched Set by KAV Models. SKU: KAVCP72008. Upgrade the clarity and realism of your...

Ahorra $2.50
Glazing for Voroshilovets (Trumpeter) - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVCP72005 KAV Models 1/72 Glazing set Voroshilovets (Trumpeter) Precio de oferta$16.68 USD Precio normal$19.18 USD

1/72 Photo-Etched Set by KAV Models. SKU: KAVCP72005. Add crisp, scale-accurate windows to your build...

Ahorra $2.70
Tinted film for MTVR Mk.23 w Armor Protection (Trumpeter) - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVTF35016 KAV Models 1:35 Markings (Decals) Tinted Film for MTVR Mk.23 w/ Armor Protection (Trumpeter) Precio de oferta$18.00 USD Precio normal$20.70 USD

1/35 Decal by KAV Models. SKU: KAVTF35016. Add realistic glazing tones to your modern military...

Ahorra $2.57
Painting mask for the glazing of M&G - 29UB (Trump) - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVM72109 KAV Models 1/72 Painting Mask MiG-29UB Glazing (Trump) Precio de oferta$17.16 USD Precio normal$19.73 USD

1/72 Paint Mask by KAV Models. SKU: KAVM72109. Precisely cut painting masks designed to simplify...

Ahorra $1.90
Painting mask for the glazing of M&G - 29 (Trump) - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVM72108 KAV Models 1/72 Painting Mask MiG-29 Glazing (Trumpeter) Precio de oferta$12.65 USD Precio normal$14.55 USD

1/72 Paint Mask by KAV Models. SKU: KAVM72108. This precision painting mask set helps you...

Ahorra $2.09
Painting mask for HEMTT (Trumpeter) - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVM72073 KAV Models 1:72 Painting Mask HEMTT (Trumpeter) Precio de oferta$13.95 USD Precio normal$16.04 USD

1/72 Paint Mask by KAV Models. SKU: KAVM72073. Precision-cut painting masks designed to help you...

Ahorra $2.26
Painting mask for S - 15UM (Trump) - imodeller.store

In stock · Ships from USA in 1-2 business days

KAVM48087 KAV Models 1/48 Painting Mask Su-15UM (Trumpeter) Precio de oferta$15.05 USD Precio normal$17.31 USD

1/48 Paint Mask by KAV Models. SKU: KAVM48087. Precision painting masks designed to help you...

Combo cockpit details for Mi - 24A for Trumpeter model 05828 1/48 (3D decal) EM48041C - imodeller.store

In stock · Ships from USA in 1-2 business days

EM48041C Embase 1/48 Combo cockpit details 3D decal for Mi-24A (Trumpeter 05828) Precio de oferta$86.25 USD

1/48 Photo-Etched Set by Embase. SKU: EM48041C. Upgrade the cockpit of your Mi-24A with a...

Ahorra $14.64
Mi - 24A seats and additional cockpit details for Trumpeter 05828 1/48 (3D decal) - imodeller.store

In stock · Ships from USA in 1-2 business days

EM48042 Embase 1/48 3D Decal Cockpit Set Mi-24A (Trumpeter 05828) Precio de oferta$22.78 USD Precio normal$37.42 USD

1/48 Photo-Etched Set by Embase. SKU: EM48042. Upgrade the cockpit of your Mi-24A with a...

Ahorra $19.16
Mi - 24A cockpit panels for Trumpeter 05828 1/48 (3D decal) - imodeller.store

In stock · Ships from USA in 1-2 business days

EM48041 Embase 1/48 3D Decal Cockpit Panels Mi-24A (Trumpeter 05828) Precio de oferta$29.80 USD Precio normal$48.96 USD

1/48 Photo-Etched Set by Embase. SKU: EM48041. Upgrade the cockpit of your Mi-24A with a...

Ahorra $19.16
MiG - 3 Cockpit details for Trumpeter 1/32 (3D decal) - imodeller.store

In stock · Ships from USA in 1-2 business days

EM32003 Embase 1/32 3D Decal Cockpit Details MiG-3 (for Trumpeter) Precio de oferta$29.80 USD Precio normal$48.96 USD

1/32 Photo-Etched Set by Embase. SKU: EM32003. Upgrade the cockpit of your 1/32 MiG-3 with...

For Trumpeter Kits

Trumpeter is one of China's largest and most prolific scale model manufacturers, offering an extraordinary range of subjects from modern military vehicles and Cold War-era aircraft to massive warship kits in multiple scales. Their ambitious approach to kit design means many of their releases cover subjects no other manufacturer has attempted, making them a favorite among modelers seeking unique and challenging builds across armor, aviation, and naval categories.

Popular Trumpeter kits that benefit from photo-etched upgrades include the massive 1/200 scale USS Missouri and Bismarck battleship kits, the 1/35 Russian T-90 and Chinese Type 99 main battle tanks, the 1/32 F-14D Tomcat, and the versatile 1/72 Su-27 Flanker family. Trumpeter's large-scale ship kits particularly benefit from PE sets that add hundreds of scale-accurate fittings impossible to reproduce in injection-molded plastic.

Key PE upgrade areas for Trumpeter kits include hull fittings and superstructure details on their ship models, fender and storage rack details on armor subjects, and cockpit and landing gear enhancements on aircraft. Their ship kits especially benefit from PE railings, catwalks, and antenna arrays that replace thick molded-on plastic details with scale-thin metal parts, dramatically improving the visual realism of these impressive large-scale builds.

Find sets for your Trumpeter build in our 1/35 Scale Photo-Etch collection, browse Ships Photo-Etch for naval subjects, or explore the full Aftermarket catalog.