Filtros

Ordenar por:

727 productos

Ahorra $2.71
Airfield equipment Su-33 - imodeller.store

In stock · Ships from USA in 1-2 business days

Equipo de aeródromo Su-33 Precio de oferta$18.08 USD Precio normal$20.79 USD

Bring a 1:72 Su-33 model to life with finely crafted ladders and wheel chocks, adding essential ground support details.

Ahorra $5.45
AH-1G Cobra Interior (ICM) - imodeller.store

In stock · Ships from USA in 1-2 business days

Interior de la cobra AH-1G (ICM) Precio de oferta$36.30 USD Precio normal$41.75 USD

Bring exceptional detail and realism to your AH-1G Cobra cockpit with precise photo-etch, featuring pre-colored instrument panels.

Ahorra $2.59
RS72026 E.V.M. 1/72 3D Printed Landing Gear Wheels for Yak - 1/3 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72026 E.V.M. 1/72 3D Printed Landing Gear Wheels for Yak-1/3 Precio de oferta$17.23 USD Precio normal$19.82 USD

Achieve superior realism on your Yak-1/3 with detailed resin landing gear wheels featuring load simulation and paint masks.

Ahorra $8.41
RS72025 E.V.M. 1/72 Landing Gear Wheels for Tu - 95MS - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72025 E.V.M. 1/72 Landing Gear Wheels for Tu-95MS Precio de oferta$56.06 USD Precio normal$64.47 USD

Upgrade your Tu-95MS with finely detailed resin landing gear wheels and included paint masks for a perfect finish.

Ahorra $4.74
RS72024 E.V.M. 1/72 Landing Gear Wheels for Mi - 26 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72024 E.V.M. 1/72 Landing Gear Wheels for Mi-26 Precio de oferta$31.62 USD Precio normal$36.36 USD

Upgrade your 1/72 Mi-26 with realistic weighted resin wheels and precision paint masks for an authentic look.

Ahorra $2.66
RS72023 E.V.M. 1/72 Vibration Damper for Mi - 8 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72023 E.V.M. 1/72 Vibration Damper for Mi-8 Precio de oferta$17.77 USD Precio normal$20.43 USD

Enhance the realism of your 1/72 Mi-8 helicopter model with two highly detailed aftermarket vibration dampers.

Ahorra $2.66
RS72022 E.V.M. 1:72 Folded Winch for Mil Mi - 8 Hip - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72022 E.V.M. 1:72 Folded Winch for Mil Mi-8 Hip Precio de oferta$17.77 USD Precio normal$20.43 USD

Add superior realism to your 1:72 Mil Mi-8 Hip with two precisely 3D-printed folded rescue winches.

Ahorra $2.92
RS72021 E.V.M. 1/72 Landing Gear Wheels for F - 14D - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72021 E.V.M. 1/72 Landing Gear Wheels for F-14D Precio de oferta$19.45 USD Precio normal$22.37 USD

Upgrade your F-14D with realistic resin wheels featuring authentic load simulation and paint masks for perfect finishes.

Ahorra $2.92
RS72020 E.V.M. 1/72 Landing Gear Wheels for F - 14A - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72020 E.V.M. 1/72 Landing Gear Wheels for F-14A Precio de oferta$19.45 USD Precio normal$22.37 USD

Upgrade your F-14A with detailed resin landing gear wheels and paint masks for a realistic weighted appearance.

Ahorra $2.89
RS72018 E.V.M. 1/72 Landing Gear Wheels for Mil Mi - 8 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72018 E.V.M. 1/72 Landing Gear Wheels for Mil Mi-8 Precio de oferta$19.22 USD Precio normal$22.11 USD

Improve your Mil Mi-8 helicopter build with highly detailed resin wheels showing realistic load effects, complemented by convenient paint masks.

Ahorra $2.82
RS72014 E.V.M. 1:72 Landing Gear Wheels (Late Type) for MiG - 21 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72014 E.V.M. 1:72 Landing Gear Wheels (Late Type) for MiG-21 Precio de oferta$18.76 USD Precio normal$21.58 USD

Upgrade your MiG-21 with these resin late-type landing gear wheels featuring realistic load simulation and included paint masks for easier painting.

Ahorra $2.62
RS72004 E.V.M. 1/72 Landing Gear Wheels for Ilyushin Il - 2 Stormovik - imodeller.store

In stock · Ships from USA in 1-2 business days

RS72004 E.V.M. 1/72 Landing Gear Wheels for Ilyushin Il-2 Stormovik Precio de oferta$17.46 USD Precio normal$20.08 USD

Upgrade your 1/72 Il-2 Stormovik with detailed resin wheels featuring realistic load imitation and included paint masks.

Ahorra $2.62
RS48113 E.V.M. 1:48 Exhaust Pipes Detail Set for Yakovlev Yak - 7 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48113 E.V.M. 1:48 Exhaust Pipes Detail Set for Yakovlev Yak-7 Precio de oferta$17.46 USD Precio normal$20.08 USD

Replace simplified kit exhausts with high-resolution 3D-printed resin parts for superior Yak-7 model realism.

Ahorra $3.39
RS48112 E.V.M. 1:48 Landing Gear Wheels for Yakovlev Yak - 7 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48112 E.V.M. 1:48 Landing Gear Wheels for Yakovlev Yak-7 Precio de oferta$22.57 USD Precio normal$25.96 USD

Add weighted realism to your Yak-7 with these resin main and tail wheels and paint masks, also fitting Yak-9, La-5, La-7, MiG-3.

Ahorra $10.16
RS48110 E.V.M. 1/48 Landing Gear Wheels for Yakovlev Yak - 7 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48110 E.V.M. 1/48 Landing Gear Wheels for Yakovlev Yak-7 Precio de oferta$15.80 USD Precio normal$25.96 USD

Upgrade your Yak-7 with weighted resin main and tail wheels, plus paint masks, also suitable for Yak-9, La-5, La-7, MiG-3.

Ahorra $3.52
RS48109 E.V.M. — F - 4 Phantom II Wing Repair Plates for MENG - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48109 E.V.M. — F-4 Phantom II Wing Repair Plates for MENG Precio de oferta$23.52 USD Precio normal$27.04 USD

Replicate distinct structural reinforcement with visible attachment nuts for a unique F-4 Phantom II look.

Ahorra $6.09
RS48104 E.V.M. 1/48 Ejection Seats K - 36D - 3.5 with 3D Decal Harness for Su - 30SM (G.W.H.) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48104 E.V.M. 1/48 Ejection Seats K-36D-3.5 with 3D Decal Harness for Su-30SM (G.W.H.) Precio de oferta$40.63 USD Precio normal$46.72 USD

Upgrade your GWH Su-30SM with highly detailed resin ejection seats featuring realistic and poseable 3D decal harness.

Ahorra $5.36
RS48100 E.V.M. 1/48 K - 37 - 800 Ejection Seat for Ka - 52 (Zvezda) - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48100 E.V.M. 1/48 K-37-800 Ejection Seat for Ka-52 (Zvezda) Precio de oferta$35.73 USD Precio normal$41.09 USD

Upgrade your Ka-52 cockpit with highly detailed K-37-800 ejection seats featuring realistic 3D decal harnesses.

Ahorra $3.33
RS48099 E.V.M. 1/48 Pilot Seat with Armored Backrest & 3D Decal Belts for LaGG - 3 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48099 E.V.M. 1/48 Pilot Seat with Armored Backrest & 3D Decal Belts for LaGG-3 Precio de oferta$22.21 USD Precio normal$25.54 USD

Upgrade your LaGG-3 cockpit with a highly accurate pilot seat featuring realistic, conforming 3D Decal belts for an authentic look.

Ahorra $2.51
RS48098 E.V.M. 1:48 3D Printed Detail Set for LaGG - 3 - imodeller.store

In stock · Ships from USA in 1-2 business days

RS48098 E.V.M. 1:48 3D Printed Detail Set for LaGG-3 Precio de oferta$16.74 USD Precio normal$19.25 USD

Upgrade your Zvezda LaGG-3 kit with precise 3D-printed propeller cone and radiators, offering superior detail and a perfect fit without modification.

Aircraft

Take your aircraft models to the next level with photo-etched detail sets. Our PE parts include cockpit instrument panels, landing gear details, control surfaces, access panels, and antenna arrays.

Available for jets, propeller aircraft, and helicopters in 1/72, 1/48, 1/144, and 1/32 scales. Compatible with Trumpeter, ICM, HobbyBoss, Zvezda, and more.